We're through the first week. This week was about site preparation and the demolition of everything that wasn't structural. The heavy duty plaster/cement structure of our interior walls resulted in a lot of cracking, so the contractors pulled down a lot more of the walls than expected.
Monday, October 22, 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment