(Yeah, I know I'm a week late.)
The big change this week was getting the drywall up. We can can finally get a good feeling for the space, and we like it!
The builder fixed my oopsie with the radiant heat pipe from last week and re-pressurized the system. He also had the HVAC crew point out where I should be putting in any floor screws (that would have been good to know last week). So, armed with this new information, I successfully installed the subfloor. Even better, the system is still holding pressure!